<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META http-equiv=Content-Type content="text/html; =
charset=iso-8859-1">
<META content="MSHTML 5.50.4134.100" name=GENERATOR>
<STYLE></STYLE>
</HEAD>
<BODY style="FONT-FAMILY: Times New Roman" text=#000000 =
bgColor=#ffffff>
<DIV><FONT face=Arial size=2>My arm is more tired after pulling on =
500 pins than
250. It's like lifting weights. more repetitions is harder. If I choose =
to try
and increase my speed of repetition, I do the same amount of work, only =
in less
time. Shouldn't I get paid for the work I do and not the time it takes? =
There is
no incentive to work harder if it all pays the same. Certainly if I do =
the same
work in less time than my competitor and charge less, I'm going to be =
the busy,
tired&nbsp;guy and he is going to have the same amount of money at the =
end of
the month as I, so why? How fast you are is an indication of your =
experience and
education.</FONT></DIV>
<DIV><FONT face=Arial size=2>Keith Roberts</FONT></DIV>
<DIV><FONT face=Arial size=2></FONT>&nbsp;</DIV>
<BLOCKQUOTE dir=ltr
style="PADDING-RIGHT: 0px; PADDING-LEFT: 5px; MARGIN-LEFT: 5px; =
BORDER-LEFT: #000000 2px solid; MARGIN-RIGHT: 0px">
  <DIV style="FONT: 10pt arial">----- Original Message ----- </DIV>
  <DIV
  style="BACKGROUND: #e4e4e4; FONT: 10pt arial; font-color: =
black"><B>From:</B>
  <A title=dm.porritt@verizon.net =
href="mailto:dm.porritt@verizon.net">David M.
  Porritt</A> </DIV>
  <DIV style="FONT: 10pt arial"><B>To:</B> <A =
title=pianotech@ptg.org
  href="mailto:pianotech@ptg.org">pianotech@ptg.org</A> </DIV>
  <DIV style="FONT: 10pt arial"><B>Sent:</B> Tuesday, June 17, 2003 =
5:25
AM</DIV>
  <DIV style="FONT: 10pt arial"><B>Subject:</B> Pitch raise</DIV>
  <DIV><BR></DIV>
  <DIV>I've seen it said several times that for a tuning fee, there is =
an
  allocated time.&nbsp; If tuning doesn't take up the whole time other =
things
  (voicing, tighten screws etc.) will be done for that same "tuning =
fee".&nbsp;
  However, many say that if they do a pitch raise, still within that =
time frame,
  that they charge extra for it.&nbsp;</DIV>
  <DIV>&nbsp;</DIV>
  <DIV>Why is it that a pitch raise requires the extra charge when =
everything
  else done during the allocated time is included in the normal =
charge?&nbsp;
  </DIV>
  <DIV>&nbsp;</DIV>
  <DIV>dave</DIV><PRE>_____________________________
David M. Porritt
dporritt@mail.smu.edu
Meadows School of the Arts
Southern Methodist University
Dallas, TX 75275
_____________________________</PRE></BLOCKQUOTE></BODY></HTML>