<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META http-equiv=Content-Type content="text/html; charset=US-ASCII">
<META content="MSHTML 6.00.2900.2523" name=GENERATOR></HEAD>
<BODY id=role_body style="FONT-SIZE: 10pt; COLOR: #000000; FONT-FAMILY: =
Arial"
bottomMargin=7 leftMargin=7 topMargin=7 rightMargin=7><FONT id=rol=
e_document
face=Arial color=#000000 size=2>
<DIV>Greetings to the list,</DIV>
<DIV> I'm afraid I have woefully underestimated the =
time
required to replace a set of hammer spring loops (or cords). On a Yama=
ha
circa 1972 upright. Schwander type action. After bringing the ac=
tion
to my workshop it took me 10 minutes to replace one string loop. Evide=
ntly
this is a 2 day job and I figured about 3 hours.</DIV>
<DIV> Is there a short cut? Would I be better =
off
to just order a new set of hammer flgs. and repin the whole darn thing? =
; I
am probably making it harder than it really is.</DIV>
<DIV> </DIV>
<DIV>Charles Cron</DIV>
<DIV> </DIV></FONT></BODY></HTML>