<html>
<body>
<font size=3>Back the screws off until the buttons drop off (into a short
container).<br><br>
This is a good opportunity to reinforce the hammer rail (especially if
the<br>
wippens are off as well) with long sheet rock screws.&nbsp; If I haven't
described<br>
this procedure on the list, I will do so with accompanying pix; it was
part of<br>
a presentation for the RI Chapter last year. (jpg attached)&nbsp; End of
tangent<br><br>
To squarely install new buttons,&nbsp; use hammer removing pliers to hold
the<br>
button against the rail. Reverse the plunger bolt so that the head is
supporting<br>
the button. The prongs which straddled the shank now will straddle the
eyescrew.<br><br>
Use moderate pressure gripping the pliers and turn the screw in,. When
the<br>
threads are in sufficiently the button will spin on the bolt head. That
usually is<br>
enough. If you have further ambition to insure their tightness after all
are installed,<br>
hold each button with your fingers and give the screw an eight to quarter
turn. <br><br>
Regards,<br><br>
Jon Page </font></body>
</html>