<html>
At 02:08 PM 2/5/2006 -0400, Terry wrote:<br>
<blockquote type=cite class=cite cite><font face="arial">I have to admit
that I still like the idea of having the full height of the flange
intimately contacting the action rail. If nothing else, it will likely
make me sleep better at night....</blockquote><br>
</font>How about routing a shallow groove the length of the new rail, and
gluing a strip of wood in to act as a spline, which would emerge just far
enough to fill the cutout in the flanges? You might need to ease the
edges with a small hand plane, maybe more easily before gluing it in,
since I believe the original rails had a tapered profile to the ridge.
<br>
<br>
You could try it on a shorter piece of scrap, to be sure it would work,
before starting in on the real action rail. <br>
<br>
Susan </html>