Guidelines/workload formula

Fred Sturm fssturm@unm.edu
Fri Feb 1 10:48 MST 2002


Dave,
	My sense is that this issue can be dealt with on a individual basis.
The workload should be the same. It's just split between an employee (or
employees) and outside contracted labor. Perhaps language to that effect
could appear in the text. 
Fred

David M. Porritt wrote:
> 
> Fred:
> 
> Something occurred to me the other day that I don't think we've
> discussed, or at least exhausted in this forum.  Should there be any
> indication as to how outside rebuilding would impact the workload.
> For example, the workload numbers should probably be significantly
> different at an institution where the staff rebuilt all the pianos
> from one where everything were sent out.  There are even several
> shades of gray in this issue.  Here, I do all action work, but all
> belly work is sent out.
> 
> It's probably too late to thoroughly discuss this, but I think it
> could be a consideration.
> 
> dave


This PTG archive page provided courtesy of Moy Piano Service, LLC