Larry, Here a question from the bushes of Holland. When you state that you can do a set of key bushings in 2 hours -/+- , do you mean both front and balance bushings? Here are the times I measured once: Steaming out front +- balance bushings 55 sec./key +AD0- 44 min./set, next time will be faster with my newly bought steam machine. Let the keys dry. Make a few test keys (10 minutes) and let them dry overnight, Bush the front 45 sec/key +AD0- 66 min./set, with self developed tool (kind bush master, picture not available yet) Bush the balance 51 sec/key +AD0- 75 min./set, this time is an estimate. Time for preparing, picking my nose and cleaning up the mess I made, 15 minutes I use plastic cauls, no press and no heat and I never have had ( ) but always +AHw- +AHw-. Always got square shoulders. The plastic cauls are available here in three sizes: 3.5mm yellow, 3.6mm blue and 3.7mm red. I bought 3 sets with 30 of each size, so I can leave the cauls in place for a few hours. Jon I don't understand why I should use a keypress? Michiel van Loon mvanloon+AEA-xs4all.nl Meppel Nederland O +ADwAXg-- +AHw- '+AFw-/+AFw- (this is me, running at a speed of 12km/h) / +AD0APQA9AD0APQA9AD0APQA9AD0APQA9AD0-:-))+AD0APQA9AD0APQA9AD0APQA9AD0APQA9AD0APQA9AD0APQA9AD4APgA+-
This PTG archive page provided courtesy of Moy Piano Service, LLC